There's a limited time to see the actual wood that was behind the terne metal. This week repairs to the wood have been taking place. Next step is to install water/ice barriers. The images are of 3-4 different spots from various angles.
2 Comments
Katherine Ziegler
7/7/2022 10:35:38 pm
I think we are lucky it didn’t fall over I. A storm!
Reply
Mimi Shipp
7/8/2022 10:21:50 am
It's actually incredibly strong. All the bad wood has been replaced and the structure itself is in great shape. The contractors and engineers have all commented that if it were being built new...it would be steel and over engineered! The way it's built, it has enough sway to take the winds!